![]() |
||||||||||
Power station electricity to be stored in tanks for use in batteries |
BOC gets help with their EM vacuum pump test facility |
|||||||||
| Improvements to the SCADA and PLC applications at Aberthaw Power Station in South Wales were welcomed by the control technicians. The system is for the.......... |
BOC Edwards enlisted Bubble Automation to help with their pump test facility at Shoreham West Sussex. The system comprises of.......... |
|||||||||
BOC Edwards impressed with increased efficiency |
BOC enlists Bubble to improve their IPX vacuum pump test facility |
|||||||||
BOC Edwards contracted Bubble Automation to improve the vacuum pump test facility at their Shoreham plant. The key objectives were.......... |
As a result of the success of the improvement work at Shoreham, BOC Edwards has contracted Bubble Automation to modify their.......... |
|||||||||
Ice cream factory gets cool front end |
Congratulations to Bubble for their help in expanding Sir Cliff Richards Winery |
|||||||||
| Aqua cooling specialize in air conditioning systems. This particular project was for an ice cream factory in Leeds. The system employed a Siemens S7 PLC and.......... |
The Adega Do Cantor Winery has now more than doubled it's capacity. The Winery situated in the Algarve region of Portugal produces the Vida Nova range of wines and.......... |
|||||||||
Chemical company benefits from the Bubble formula |
Hot contract for ongoing smoke control projects |
|||||||||
| This big player in the chemical market were converting existing hardware and an existing process to perform a new task. The existing DCS.......... |
We have completed a number of projects for this control systems company and are assured that there will be plenty of projects in the future.Part of this companies business is......... |
|||||||||
BOC go for the Bubble touch on their XDS Scroll pump rig |
Milk and cream flow logging modified at Dairy Crest, another smooth contract |
|||||||||
| After a continued relationship with BOC Edwards, Bubble Automation was asked to provide an upgrade solution to an existing XDS – Scroll pump test facility at their........... |
News in editing room |
|||||||||
Major supplier to the car industry requests changes to their pick by light system |
No time to swan around when there is bird flu about |
|||||||||
| Our client is a leader in the design and production of a wide range of components for the automobile industry including vehicle headliners. Modular headliners save considrable.......... |
Through our links with Group Schnieder we received an interesting project for Hydor Ltd. This project was for Bristol University and was to help in the investigation..... |
|||||||||
Sweet little job at the chocolate factory |
Transit front axle assembly line turns out to be a winner |
|||||||||
| We were called out to an intermittent fault on a high speed chocolate wrapping system. No modifications were made but we were able.......... |
Thyssen Krupp contacted Bubble Automation to help upgrade one of their production lines. The project threw up several key challenges one of which was.......... |
|||||||||
Eurostar upgrade their battery maintenance facility |
Nice clean job for electrolux in France |
|||||||||
| News in editing room |
During a large project installation in France for Electrolux Bubble Automation was contacted to provide urgent needed Group Schnieder TSX PLC support for the main |
|||||||||
Bubble Automation sponsor Gosport F.C. |
Saacke Burner Controls ignites another Bubble relationship |
|||||||||
| News in editing room |
News in editing room |
|||||||||
BOC Edwards makes its move to Czech mate |
||||||||||
| Continuing with the long-term relationship Bubble Automation has with BOC Edwards. We were entrusted with a fairly complicated project, which required.......... |
||||||||||
Related Topics Quotation for Allen Bradley Controllogix system, Factory software engineers, Factory automation
engineers, |
||||||||||